1 |
Bosco N. Silva & Others, Dongorim, Navelim, Salcete, Goa. |
Construction of Building & Compound Wall Sy No.29 Sub Div7 at Mandopa |
2761 Dt 22/3/16 |
2(4) Dt 28/3/16. |
VP/N/Const.L.6/2015-16 dt.8/6/15. |
1,48,55,300/- |
74,400/- |
53/87 Dt 6/4/16 |
2 |
George Joseph & Gracy George, Navelim, Salcete, Goa. |
Construction of Building (Shop) Sy. No.185 Sub Div 4-A-2 at Nagmodem |
2481 Dt 19/2/16 |
3(2) Dt 24/2/16. |
VP/N/Const.L.2/2016-17 |
4,58,000/- |
2350/- |
54/34 Dt 11/4/16 |
3 |
Menino S. A. Gonsalves, Navelim, Salcete, Goa. |
Construction of Building (addition/extension to the existing ground floor, first and part second floor) Sy No.68 Plot No.14 Sub Div 3 |
102 dt 17/04/15 |
3(5) Dt 20/4/15. |
VP/N/Const.L.3/2016-17 dt 18/4/2016 |
23,83,008/- |
12,000/- |
55/35 Dt 18/4/2016 |
4 |
Amy Barretto, Telaulim,Salcete-Goa. |
Construction of Residential House Plot No.7 Sy No.168 Sub-Div 7 at Sinquetim |
2720 Dt 17/3/16 |
2(1) Dt 28/3/16. |
VP /N/Const.L.4/2016-17 dt 27/4/2016 |
25,28,350/- |
12,700/- |
57/29 Dt 27/4/2016 |
5 |
Jude John Almeida, Velim, Salcete-Goa. |
Construction of Compound Wall Plot No. A-1 Survey No.92 Sub Division 1-A at Nagmodem |
2764 Dt 20/3/16 |
ResNo.2(3) Dt 28/03/16.. |
VP/N/Const.L.5/2016-16 Date:29/04/2016 |
1,70,660/- |
950/- |
57/73 dated 29/04/16 |
6 |
Kunda Raghuvir Gharse,Navelim Salcete-Goa. |
Construction of Compound Wall Survey No.9 Sub Division 17-A at Dongorim |
2351 Dt 5/2/16 |
Res No.3(1) Dated 24/02/16. |
VP/N/Const.L. 6/2016-17 Dt 05/5/16 |
2,15,000/-/- |
1050/- |
58/45 dt 05/05/16 |
7 |
Vinayak D. Bhende & Deepali V. Bhende ,Margao,Goa. |
Construction of Residential Bungalow,Compound wall & well. Plot No.27 Survey at No.175 Sub-Division 1-E M at Moddi |
106 Dt 15/4/16 |
Res No.5(1) Dt 22/04/16. |
VP/N/Const.L.7/2016-17 Dt 10/05/16 |
21,50,000/- |
10,800/- |
59/25 dated 10/05/16 |
8 |
Minguel Ismail Barretto,Vanelim,Colva,Salcete-Goa. |
Construction of House Survey No.165 Sub-Division 5 at Sinquetim |
124 Dt 18/4/16 |
Res No.5(2) Dt22/04/2016. |
VP/N/Const.L.8 /2016-17 Dt 16/5/2016 |
9,42,800/- |
1,800/- |
59/82 dated 16/05/16 |
9 |
Ramanand Raicar & Others, Navelim,Salcete,Goa. |
Construction of Residential Villas & Compound Wall Part E, Survey No.67 Sub-Division 11-A & 11 at Ravora |
2778 Dt 23/3/16 |
Res No. 2(8) Dt 28/3/16. |
VP/N/Const.L.9/2016-17 Dt 19/5/2016 |
42,54,693/- |
22,500/- |
60/69 Dt 19/5/16 |
10 |
Marilyn Bianca Fernandes & Rodney Valerio Fernandes, Navelim, Salcete,Goa. |
Land sub-division (Final). Sy No.90/3-A in plot No.A & B at Ratwaddo |
397 Dt 7/5/16 |
Res No.2(7) Dated 28/03/16. |
VP/N/Const.L.10/2016-17 Dt 20/05/2016 |
15,800/- |
25,400/- |
60/72 Dt 19/5/16 |
11 |
Jimmy Seby Vaz & Percyla Francy Barretto, Navelim, Salcete-Goa. |
Construction of Residential Bungalow Sy No.223, Sub-division 1-A, at Ratwaddo |
312 Dt 9/5/16 |
ResNo.2(2) Dated 12/05/16. |
VP/N/Const.L.11/2016-17 Dt 21/05/16 |
26,12,064/- |
13,150/- |
61/13 Dt 21/5/16 |
12 |
Somenath Mohanty & Aparna Mohanty, Margao, Goa. |
Construction of Building & Compound Wall. Plot No. 8 Sy No.175 Sub Div 1-G at Moddi |
358 Dt 13/5/16 |
Res No. 2(2) Dt 15/6/16. |
VP/N/Const.L.12/2016-17 Dt 29/6/2016 |
28,83,000/- |
14,500/- |
65/93 Dt 29/6/2016 |
13 |
Somenath Mohanty & Aparna Mohanty, Margao, Goa. |
Construction of Building & Compound Wall. Plot No. 9 Sy No.175 Sub Div 1-G at Moddi |
359 Dt 13/5/16 |
Res No. 2(1) Dt 15/6/16. |
VP/N/Const.L.13/2016-17 Dt 29/6/2016 |
33,53,000/- |
16,815/- |
65/94 Dt 29/6/2016 |
14 |
Nina Fatima Gomes, Margao,Goa. |
Construction of Twin Bungalows & Compound Wall Sy No.190/5-A-4 at Moddi |
568 Dt 08/6/16 |
Res No. 2(5) Dt 15/06/16. |
VP/N/Const.L.14/2016-17 Dt 30/06/16 |
36,64,976/- |
18,500/- |
66/21 dt 30/06/16 |
15 |
Mandar S. Naik, Mandopa ,Navelim, Salcete-Goa. |
Construction of Residential House Sy No.46 Sub Div 2-L |
508 Dt 15/6/15 |
Res No. 3(45) Dt 15/06/2016. |
VP/N/Const.L.15/2016-17 Dt 30/6/16 |
29,09,340/- |
14,600/- |
66/49 dt 30/06/16 |
16 |
Simon F. Fernandes, Navelim, Salcete, Goa. |
Construction of building Sy No.169 Sub Div 8-A at Fradilem |
442 Dt 23/5/16 |
Res No 2(3) Dt 15/6/16. |
VP/N/Const.L.16/2016-17 Dt 02/07/2016 |
65,70,910/- |
32,950/- |
66/57 Dt 02/7/16 |
17 |
Roy Alphonso ,Navelim, Salcete-Goa. |
Construction of Residential House (revised plan). Sy No.162/5 at Fradilem |
1629 Dt 30/7/2008 |
Res No. 3(1) Dt 27/6/16. |
VP/N/Const.L.17/2016-17 Dt 12/7/2016 |
5,35,226/- |
NIL |
NIL |
18 |
Village Panchayat Navelim, Salcete, Goa. |
Development of football ground, Construction of Building & Compound Wall Sy No. 108/3,109/1,2,3,8,9,10 & 11 at Sinquetim |
834 Dt 11/7/16 |
Res No. 2(4) Dated 14/07/2016. |
VP /N/Const.L.18/2016-17 Dt 14/07/2016 |
|
Rs.Nil (Fees exemted) |
NIL |
19 |
Prudencio J. Carneiro & Patcia Carneiro,H.No.77, 1st Daddio, Telaulim,, Navelim, Salcete, Goa.. |
Construction of building Sy No.102 Sub Div 3-A at Nagmodem |
782 Dt 5/7/16 |
Res No. 2(2) Dt 14/7/16. |
VP/N/Const.L.19/2016-17 Dt 26/7/2016 |
15,65,600/- |
Rs. 7828/- |
70/2 Dt 26/7/2016 |
20 |
Ahhinay Mangesh Dessai, H. No. 454, Dessai Wada, Agonda , Canacona ,Goa. |
Construction of Bungalow & Compound Wall Sy No.169 Sub-Div 13 Plot No.51 |
819 Dt8/7/16 |
Res No. 2(3) Dt 14/7/16. |
VP/N/Const.L.20/2016-17 Dt 29/7/2016 |
60,35,800/- |
Rs. 30,250/- |
70/66 Dt 29/7/2016 |
21 |
M/S Royal Builders & Real Estate Developers, Navelim, Salcete, Goa. |
Construction of building roof plan (revised plan). Sy No.29 Sub Div 7-A. |
955 Dt 25/7/16 |
ResNo. 2(4) Dated 28/7/16. |
VP/N/Const.L.21/2016-17 Dt 09/8/2016 |
|
NIL |
NIL |
22 |
Royal Developers, Navelim, Salcete, Goa. |
Construction of building block B1 and B2 roof plan (revised plan). Sy No.29 Sub Div 7-B. |
956 Dt 25/7/16 |
Res No. 2(5) Dated 28/7/16. |
VP/N/Const.L.22/2016-17 Dt 09/8/2016 |
|
NIL |
NIL |
23 |
Roselina Fernandes, Navelim Salcete -Goa. |
Proposed Construction of Compound Wall. Sy No.166 Sub Div 1-A at Sinquetim. |
828 Dt 11/7/16 |
Res No 2(5) Dt 14/7/16. |
VP/N/Const.L.23/2016-17 Dt 19/8/16 |
2,00,000/- |
1050/- |
73/32 Dt 19/8/2016 |
24 |
Asmucao C. Rebello & Others, Navelim,Salcete,Goa.. |
Construction of Residential Bungalow & Compound Wall Part C, Survey No.67 Sub-Division 11-A & 11 at Ravora. |
2781 Dt 23/3/16 |
Res No. 2(5) Dt 28/3/16. |
VP/N/Const.L.24/2016-17 Dt 18/8/2016 |
14,19,585/- |
7900/- |
60/71 Dt 19/5/16 |
25 |
Caetana Miranda & Others, Navelim,Salcete,Goa .. |
Construction of Residential Bungalow & Compound Wall Part B, Survey No.67 Sub-Division 11-A & 11 at Ravora. |
2780 Dt 23/3/16 |
Res No. 2(6) Dt 28/3/16. |
VP/N/Const.L.25/2016-17 Dt 18/8/2016 |
1,40,000/- |
9900/- |
60/70 Dt 19/5/16 |
26 |
Antoneta Sequeira e Cardozo & Others, Navelim,Salcete,Goa |
Construction of Duplex Bungalow & Compound Wall. Part D, Survey No.67 Sub-Division 11-A & 11 at Ravora |
2779 Dt 23/3/16 |
Res No. 2(7) Dt 28/3/16 |
VP/N/Const.L.26/2016-17 Dt 18/8/2016 |
2,57,400/- |
25,400/- |
60/72 Dt 19/5/16 |
27 |
Ramanand Raicar & Others, Navelim,Salcete,Goa |
Construction of Residential Villas & Compound Wall Part E, Survey No.67 Sub-Division 11-A & 11 at Ravora |
2778 Dt 23/3/16 |
Res No. 2(8) Dt 28/3/16 |
VP/N/Const.L.27/2016-17 Dt 18/8/2016 |
42,54,693/- |
22,500/- |
60/69 Dt 19/5/16 |
28 |
Armando Gomes, Dongorim, Navelim, Salcete, Goa |
Construction of building (roof plan) revised plan. Sy No.21 Sub Div 4 at Dongorim |
1126 Dt 10/8/16 |
Res No 2(4) Dt 16/8/16 |
VP/N/Const.L.28/2016-17 Dt 23/8/16 |
38,28,500/- |
100/- |
73/69 Dt 23/08/16 |
29 |
Savio Lamartine Gomes, Malbhat, Margao, Goa |
Construction of building blocks A, B,C, D & E types, security cabin and compound wall Sy No.190 Sub Div 5-F2 at Moddi |
844 Dt 12/7/16 |
Res No. 2(1) Dt 28/7/16 |
VP/N/Const.L.29/2016-17 Dt 24/08/16 |
1,97,73,000/- |
98,950/- |
73/75 Dt 24/8/16 |
30 |
Nilufer Naaz & Mohammed Zameer Ahmed, Dramapur, Salcete |
Construction of Residential Duplex bungalows (Revised Plan). Sy. No.198 Sub-Div 15 |
924 Dt 21/7/16 |
Res No. 2(2) Dt 28/7/16 |
VP/N/Const.L.30/2016-17 Dt 25/08/16 |
25,04,500/- |
Nil |
NIL |
31 |
Mario Luis Mascarenhas & Plaxie Alinda Coutinho e Mascarenhas, Navelim Salcete -Goa |
Proposed Construction of Compound Wall Sy No. 166 Sub Div 1-B at Sinquetim |
1075 Dt 5/8/2016 |
Res No. 2(1) Dt 16/8/16 |
VP/N/Const.L.31/2016-17 Dt 02/09/16 |
2,50,000/- |
1300/- |
74/95 Dt 2/9/16 |
32 |
Hilarina Leticia A. Coutinho alias Leticia Fernandes, Navelim, Salcete-Goa |
Construction of Bungalow, Compound Wall & Well Sy No.169, Sub-Div 8-F at Fradilem |
1211 Dt 22/8/16 |
Res No. 3(3) Dt 31/08/16 |
VP/N/Const.L.32/2016-17 Dt 12/09/2016 |
35,00,000/- |
17,600/- |
76/73 Dt 12/09/16 |
33 |
Jose R. Rebello, Nagmoddem, Salcete, Goa |
Construction of bungalow (Revised Plan) Sy No.102 Sub-Div 3 at Nagmodem |
1219 Dt 23/8/16 |
Res No. 3(2) Dt 31/08/16 |
VP/N/Const.L.33/2016-17 Dt 12/9/2016 |
14,70,000/- |
5,450/- |
76/78 dt 12/09/16 |
34 |
Minguel Ismail Barreto, Vanelim, Salcete, Goa |
Construction of house ( Revised plan). Sy No.165 Sub-Div 5 at Sinquetim |
1199 Dt 22/8/16 |
Res No. 3(1) Dated 31/08/2016 |
VP/N/Const.L.34/2016-17 Dt 12/9/2016 |
3,42,800/- |
NIL |
NIL |
35 |
Valentino Cardozo & Edviza H. Cardozo, Navelim, Salcete -Goa |
Proposed Construction of alteration to existing ground floor and proposed first floor. Sy No.88,Sub Div 10at Ratwaddo. |
1076 Dt 06/08/16 |
Res No. 2(2) Dated 16/08/2016 |
VP/N/Const.L.35/2016-17 Dt 19/9/2016 |
15,57,792/- |
7850/- |
77/74 Dt 19/9/16 |
36 |
Rosada Pereira alias Rosada Rodrigues,Rosario Cirilo Rodrigues and Rony Rodrigues, Nagmoddem , Navelim, Salcete -Goa. |
Proposed Construction of additional row houses. Sy No.199, Sub Div 9 At Moddi |
226 Dt 28/4/16 |
Res No. 2(3) Dated 16/08/2016 |
VP/N/Const.L.36/2016-17 Dt 28/9/16 |
8844120/- |
44,300/- |
79/44 Dt 28/09/16 |
37 |
Deepa Rane & Others, Canacona,Goa |
Construction of Bungalow Compound Wall & Well. SyNo.198 Sub-Div12 at Moddi |
1254 Dt 26/8/16 |
3(4) Dt 31/08/16 |
VP/N/Const.L.37/2016-17 Dt 04/10/16 |
29,21,480 |
14,650/- |
80/1 Dt 04/10/16 |
38 |
Ana Maria Rebello, Sinquetim, Navelim, Salcete -Goa |
Proposed Construction of alteration/addition to existing ground floor and first floor. SyNo.123, Sub Div1at Sinquetim |
1541 Dt 30/9/16 |
Res No. 2(3) Dt 07/10/16 |
VP/N/Const.L.38/2016-17 Dt 26/10/2016 |
7,80,000/- |
3,950/- |
82/48 Dt 26/10/16 |
39 |
Donata Clyte Fernandes e Colaco, Moddi, Navelim Salcete -Goa |
Proposed Construction of Compound Wall. Sy No.29 Sub Div 8-B at Mandopa |
1319 Dt 2/9/16 |
Res No 2(1) Dt 20/9/16 |
VP/N/Const.L.39/2016-17 Dt 27/10/2016 |
40,000/- |
250/- |
82/54 Dt 27/10/16 |
40 |
Margarida Fernandes, Dongorim,Navelim Salcete -Goa |
Proposed Construction of Compound Wall. Sy No.29 Sub Div 8-A at Mandopa |
1320 Dt 2/9/16 |
Res No 2(2) Dt 20/9/16 |
VP/N/Const.L.40/2016-17 Dt 27/10/2016 |
40,000/- |
250/- |
82/55 Dt 27/10/16 |
41 |
Donald G. Fernandes & three Others, Navelim, Goa |
Construction of building & bunglows A & B types and compound wall. Sy No.25 Sub Div 13 at Dongorim |
1539 Dt 29/9/16 |
Res No. 2(2) Dt 7/10/16 |
VP/N/Const.L.41/2016-17 Dt 03/11/16 |
1,45,41,250/- |
73,000/- |
83/28 Dt 03/11/16 |
42 |
Ganpat S. Lotlikar, Sinquetim, Navelim, Salcete, Goa, |
Proposed Part re-construction and addition/extension to the existing house. Sy. No. 138 Sub div 1-A at Sinquetim. |
1524 Dt 7/10/16 |
Res No. 2(1) Dt 7/10/16 |
VP/N/Const.L.42/2016-17 Dt 03/11/16 |
38,46,892/- |
19300/- |
83/31 Dt 3/11/16 |
43 |
Maria Dos Anjos Mergulhao , 210 “Dias”, Nr. Shalom Valley View Bldg, Mangor Hill, Vasco Da Gama . |
Construction of Bungalow & Compound Wall. Sy No.24 Sub-Div 10 at Dongorim |
2004 Dt 15/10/16 |
ResNo.2 Dt 28/12/15 |
VP/N/Const.L.43/2016-17 Dt 04/11/16 |
36,50,846/- |
18,350/- |
83/39 dt 04/11/16 |
44 |
Salvador Gomes, Navelim, Salcete-Goa |
Construction of Residential House.Sy No.47 Sub Div 1-P at Mandopa |
1691 Dt 18/10/16 |
Res No 2(1) Dt 28/10/16 |
VP/N/Const.L.44/2016-17 Dt 08/12/2016 |
7,77,385/- |
3950/- |
84/90 Dt 21/11/16 |
45 |
Constancio Noronha & Piedade Carmo Da Silva, Navelim, Salcete,Goa. |
Construction of Store room for (residential purpose) and compound wall. Sy No.181 in plot No.A, Sub Div 11 at Sinquetim |
1660 Dt 13/10/16 |
ResNo. 2(2) Dt 28/10/16 |
VP/N/Const.L.45/2016-17 Dt 23/11/2016 |
2,09,928/- |
1,100/- |
85/9 Dt 23/11/16 |
46 |
Ovidio S.F. Pereira, Sinquetim, Navvelim, Salcete, Goa. |
Construction of residential house (Revised). Sy No.99 , Sub-Div 5-B at Sinquetim |
928 Dt 21/07/16 |
Res No. 3(3) Dt 28/7/16 |
VP/N/Const.L.46/2016-17 Dt 21/12/2016 |
30,48,000/- |
750/- |
87/68 Dt 21/12/16 |
47 |
Anant Ranganath Pai Kakode and Sheela Anant Pai Kakode, H.No.949/A, Navelim, Salcete, Goa.. |
Construction of residential house Sy No. 55 , Sub-Div4-D at Mandopa. |
1946 Dt 19/11/16 |
2(1) Dt 12/1/17 |
VP/N/Const.L.47/2016-17 Dt 14/03/17 |
25,23,599/- |
12,700/- |
100/77 Dt 14/3/17 |
48 |
Baburao S. Shetkar, Navelim, Salcete- Goa |
Construction of Residential Bungalow & Compound Wall.Sy No.94/8(part) in plot No. 2 at Nagmodem. |
1910 Dt 14/11/16 |
2(1) Dt 25/11/16 |
VP/N/Const.L.48/2016-17 Dt 16/03/17 |
40,73,380/- |
20,500/- |
4/4 Dt 16/3/17 |
49 |
Somenath Mahanty & Aparna Mahanty Flat no. TF-2, Rosemin Arcade Aquem, Margao, Goa. |
Construction of residential building (Revised plan). SyNo.175, Plot No.8, Sub-Div 1-G at Moddi. |
2663 Dt 6/3/17 |
3(4) Dt 9/3/17 |
VP/N/Const.L.49/2016-17 Dt 20/3/17 |
34,15,100/- |
2,700/- |
4/56 Dt 20/3/17 |